Live picture kept current. Eleventh produced Piece 2 habit.
Status. 5 Sep 2026 · 21:55. Category Slot Work (how the system presents) · Evidence destination-delta.
Contract. c8f3a21b · Job 1 Four-line live picture.
08:55: answered ~10:50 Vision-first — not skip. Previous filed hour 20:55 EXISTS — not FAIL. Not a decision point. Eleventh produced Job 1 after Vision-first (10:55, 11:55, 12:55, 13:55, 15:55, 16:55, 17:55, 18:55, 19:55, 20:55; 14:55 was decision-ask-only). N=11 toward C1 evidence count — still do not claim C1 activated. 14:55: skipped (no reply by 16:25). 17:15 close: already scored no/no chain broken — separate routine; not stolen.
Headline
Phone once: the four-line live picture is current for this hour. That is Vision-first Piece 2 — eleventh produced Job 1 that keeps the board current (after 10:55, 11:55, 12:55, 13:55, 15:55, 16:55, 17:55, 18:55, 19:55, and 20:55; 14:55 was decision-ask-only). Job 1 ran without a re-brief. That is the machine carrying vision — not a P move.
The four lines (board only)
- Destination. $2.5–5bn company; Vision standing ring; compile 0; P empty; no path named.
- What this hour was supposed to strengthen. Vision-first Piece 2 habit — eleventh produced Job 1 after Vision-first (10:55, 11:55, 12:55, 13:55, 15:55, 16:55, 17:55, 18:55, 19:55, 20:55; 14:55 was decision-ask-only). N=11 toward C1 evidence count; do not claim C1 activated. Continue Vision-first without inventing a second named job.
- What actually got built/updated. Updated live picture for 21:55; agent receipt; this dated record; status/index/hour-log; attention mirrors; Dev vision-first mirror; published.
- Machine. Stronger on Piece 2 habit (eleventh produced Job 1 current board; Job 1 ran without re-brief). Destination delta on P = no material change. Not noisier: no thin map, no careful-only as the product.
Why this hour
Vision-first Piece 2 + destination delta: prior produced Job 1 hours kept the board current through 20:55 (N=10); this :55 is the eleventh produced Job 1 after the 17:15 close. That keeps the deliverable count on the C1 evidence watch at N=11 — still not activated (thin volume must also stop being the modal hour type across a week). Strengthens the machine that carries vision — not a fake P move. P stays empty (honest). Continue Vision-first without inventing a second named job.
What the agent just did
Updated standing founder-view-live-picture.md; wrote agent receipt directory/live-picture-2026-09-05-2155.md; wrote this dated Slot Work record; refreshed vision-first-five / frontier-required-outputs / frontier-review Piece 2 to 21:55 eleventh produced; light note on cuts-forward (C1 N=11 evidence count, not activated); light note on named-jobs (Job 1 also at 21:55, no new job invented); status + index; hour-log; Dev vision-first.html mirror; build + publish; verified HTTPS GET. Did not invent a buyer. Did not rewrite Current slot. Did not claim a new layer. Did not unpark the cut. Did not hire. Did not thin-recon. Did not claim C1/C2 activated. Did not re-ask 08:55. Did not steal the 17:15 close.
Alternatives rejected
Thin recon · careful-only page as the product · invent path/P · unpark cut · rewrite slot · new layer claim · invent a second named job without control say-so · re-ask 08:55 · claim C1 activated at N=11 without the week-modal clear · leave live picture stale after 20:55.
Pushback invited — decide or criticise
- With N=11 Vision-first Job 1 deliverables (gap at 14:55 decision-ask), is Piece 2 habit settled enough, or keep counting toward a longer streak before treating C1 prep as near activation?
- Should the next named job (after Job 1) wait for a later decision point, or stay at one concrete job until you name the next finished shape?
- Anything the four lines must never say that is not already on the vision lock?
Watch
14:55 skipped (no reply by 16:25); 17:15 close scored no/no; Vision-first continues. Every later produced hour updates the same live-picture URL. Phone once. N=11 on C1 evidence count; do not claim C1 activated.
Links
Live picture · Direction Vision-first · Agent receipt · vision-first-five · Dev Vision-first
Confirmation
Contract c8f3a21b live. Piece 2 present this hour (eleventh produced Job 1). No invent. No unpark. No hire. Current slot unchanged. No new layer. P empty. Destination delta on P = no material change. C1/C2 not activated. 14:55 skipped after 16:25.