Live picture kept current. Sixth produced Piece 2 habit.
Status. 5 Sep 2026 · 16:55. Category Slot Work (how the system presents) · Evidence destination-delta.
Contract. c8f3a21b · Job 1 Four-line live picture.
08:55: answered ~10:50 Vision-first — not skip. Previous filed hour 15:55 EXISTS — not FAIL. Not a decision point. Sixth produced Job 1 after Vision-first (10:55, 11:55, 12:55, 13:55, 15:55; 14:55 was decision-ask-only). N=6 toward C1 evidence count — still do not claim C1 activated. 14:55: skipped (no reply by 16:25); proceeded without new founder input under Vision-first.
Headline
Phone once: the four-line live picture is current for this hour. That is Vision-first Piece 2 — sixth produced Job 1 that keeps the board current (after 10:55, 11:55, 12:55, 13:55, and 15:55; 14:55 was decision-ask-only). Job 1 ran without a re-brief. That is the machine carrying vision — not a P move.
The four lines (board only)
- Destination. $2.5–5bn company; Vision standing ring; compile 0; P empty; no path named.
- What this hour was supposed to strengthen. Vision-first Piece 2 habit — sixth produced Job 1 after Vision-first (10:55, 11:55, 12:55, 13:55, 15:55; 14:55 was decision-ask-only). N=6 toward C1 evidence count; do not claim C1 activated. Also: 14:55 window closed 16:25 with no reply — proceeded without new founder input under Vision-first.
- What actually got built/updated. Updated live picture for 16:55; agent receipt; this dated record; logged 14:55 skip; status/index/hour-log; attention mirrors; Dev vision-first mirror; published.
- Machine. Stronger on Piece 2 habit (sixth produced Job 1 current board; Job 1 ran without re-brief). Destination delta on P = no material change. Not noisier: no thin map, no careful-only as the product.
Why this hour
Vision-first Piece 2 + destination delta: 10:55–13:55 produced four Job 1 hours; 14:55 was decision-ask-only (N stayed 4); 15:55 was the fifth produced; this :55 is the sixth produced Job 1 that keeps the board current. That keeps the deliverable count on the C1 evidence watch at N=6 — still not activated (thin volume must also stop being the modal hour type across a week). Strengthens the machine that carries vision — not a fake P move. P stays empty (honest). 14:55 skip logged at 16:25 — continue Vision-first without inventing a second named job.
What the agent just did
Updated standing founder-view-live-picture.md; wrote agent receipt directory/live-picture-2026-09-05-1655.md; wrote this dated Slot Work record; refreshed vision-first-five / frontier-required-outputs / frontier-review Piece 2 to 16:55 sixth produced; light note on cuts-forward (C1 N=6 evidence count, not activated); light note on named-jobs (Job 1 also at 16:55, no new job invented); decision-points + founder-decisions 14:55 → skipped (no reply by 16:25); status + index; hour-log; Dev vision-first.html mirror; build + publish; verified HTTPS GET. Did not invent a buyer. Did not rewrite Current slot. Did not claim a new layer. Did not unpark the cut. Did not hire. Did not thin-recon. Did not claim C1/C2 activated. Did not re-ask 08:55.
Alternatives rejected
Thin recon · careful-only page as the product · invent path/P · unpark cut · rewrite slot · new layer claim · invent a second named job without control say-so · re-ask 08:55 · claim C1 activated at N=6 without the week-modal clear · leave 14:55 as “pending” after 16:25.
Pushback invited — decide or criticise
- With N=6 Vision-first Job 1 deliverables (gap at 14:55 decision-ask), is Piece 2 habit settled enough, or keep counting toward a longer streak before treating C1 prep as near activation?
- Should the next named job (after Job 1) wait for a later decision point, or stay at one concrete job until you name the next finished shape?
- Anything the four lines must never say that is not already on the vision lock?
Watch
14:55 skipped (no reply by 16:25); Vision-first continues. Every later produced hour updates the same live-picture URL. Phone once. N=6 on C1 evidence count; do not claim C1 activated.
Links
Live picture · Direction Vision-first · Agent receipt · vision-first-five · Dev Vision-first
Confirmation
Contract c8f3a21b live. Piece 2 present this hour (sixth produced Job 1). No invent. No unpark. No hire. Current slot unchanged. No new layer. P empty. Destination delta on P = no material change. C1/C2 not activated. 14:55 skipped after 16:25.