Live picture kept current. Second consecutive Piece 2 habit.
Status. 5 Sep 2026 · 11:55. Category Slot Work (how the system presents) · Evidence destination-delta.
Contract. c8f3a21b · Job 1 Four-line live picture.
08:55: answered ~10:50 Vision-first — not skip. Previous filed hour 10:55 EXISTS — not FAIL. Second consecutive produced :55 after Vision-first.
Headline
Phone once: the four-line live picture is current for this hour. That is Vision-first Piece 2 — second consecutive produced :55 that keeps the board current (after 10:55). Same hour also closed the Overnight gap for night of 4–5 Sep (c0cbf4d7) — maintenance, not the Vision product.
The four lines (board only)
- Destination. $2.5–5bn company; Vision standing ring; compile 0; P empty; no path named.
- What this hour was supposed to strengthen. Vision-first Piece 2 habit — second consecutive produced :55 that keeps the live picture current (after 10:55).
- What actually got built/updated. Updated live picture for 11:55; agent receipt; this dated record; overnight 4–5 Sep backfill; status/index/hour-log; Dev vision-first mirror; published.
- Machine. Stronger on Piece 2 habit (second consecutive current board). Destination delta on P = no material change. Not noisier: no thin map, no careful-only as the product.
Why this hour
Vision-first Piece 2 + destination delta: 10:55 started the habit; this :55 is the second consecutive produced hour that keeps the board current. Strengthens the machine that carries vision — not a fake P move. P stays empty (honest). Overnight backfill is cadence (c0cbf4d7), not the hour’s Vision lead.
What the agent just did
Updated standing founder-view-live-picture.md; wrote agent receipt directory/live-picture-2026-09-05-1155.md; wrote this dated Slot Work record; wrote Overnight night of 4–5 Sep; refreshed vision-first-five / frontier-required-outputs / frontier-review Piece 2 to 11:55 second consecutive; light note on cuts-forward (C1 evidence watch, not activated); status + index; hour-log; Dev vision-first.html mirror; build + publish; verified HTTPS GET. Did not invent a buyer. Did not rewrite Current slot. Did not claim a new layer. Did not unpark the cut. Did not hire. Did not thin-recon. Did not claim C1/C2 activated.
Alternatives rejected
Thin recon · careful-only page as the product · invent path/P · unpark cut · rewrite slot · new layer claim · lead with overnight instead of live picture · re-ask 08:55 · claim C1 activated at N=2.
Pushback invited — decide or criticise
- Is two consecutive produced :55 hours enough proof of Piece 2 habit, or wait for N≥3 before treating the habit as settled toward C1 evidence?
- Keep overnight backfill in the same hour as Job 1 when the gap is open, or always separate nights into their own :55?
- Anything the four lines must never say that is not already on the vision lock?
Watch
14:55 next standing ask. Every later produced hour updates the same live-picture URL. Phone once. Build consecutive Vision-first hours toward C1 evidence (N≥3); do not claim C1 activated.
Links
Live picture · Direction Vision-first · Agent receipt · Overnight 4–5 Sep · vision-first-five · Dev Vision-first
Confirmation
Contract c8f3a21b live. Piece 2 present this hour (second consecutive). No invent. No unpark. No hire. Current slot unchanged. No new layer. P empty. Destination delta on P = no material change. C1/C2 not activated.