Live picture kept current. Vision-first Piece 2 habit starts.
Status. 5 Sep 2026 · 10:55. Category Slot Work (how the system presents) · Evidence destination-delta.
Contract. c8f3a21b · Job 1 Four-line live picture.
08:55: answered ~10:50 Vision-first — not skip. Previous filed hour 09:55 EXISTS — not FAIL.
Headline
Phone once: the four-line live picture is current for this hour. That is Vision-first Piece 2 — the habit, not another careful receipt.
The four lines (board only)
- Destination. $2.5–5bn company; Vision standing ring; compile 0; P empty; no path named.
- What this hour was supposed to strengthen. Vision-first Piece 2 habit — first scheduled :55 that keeps the live picture current after direction landed (~10:50).
- What actually got built/updated. Updated live picture for 10:55; agent file; this dated record; frontier Piece 2 → present; indexes; published.
- Machine. Stronger on Piece 2 habit (inspectable URL kept current). Destination delta on P = no material change.
Why this hour
Vision-first Piece 2 + destination delta: the encode at ~10:50 filed the shell; this :55 is the first scheduled hour that keeps the board current. Strengthens the machine that carries vision — not a fake P move. P stays empty (honest).
What the agent just did
Updated standing founder-view-live-picture.md; wrote agent receipt directory/live-picture-2026-09-05-1055.md; wrote this dated Slot Work record; marked Piece 2 present on frontier-required-outputs, vision-first-five, frontier-review §5; status + index; hour-log; build + publish; verified HTTPS GET. Did not invent a buyer. Did not rewrite Current slot. Did not claim a new layer. Did not unpark the cut. Did not hire. Did not thin-recon.
Alternatives rejected
Thin recon · careful-only page · invent path/P · unpark cut · rewrite slot · new layer claim · overnight steal · re-ask 08:55.
Pushback invited — decide or criticise
- Is “first :55 after direction” the right Piece 2 proof, or should Piece 2 stay partial until several hours in a row keep the board current without you chasing?
- Keep control point + proof under the four lines on the habit URL, or move those to Agent View only?
- Anything the four lines must never say that is not already on the vision lock?
Watch
14:55 next standing ask. Every later produced hour updates the same live-picture URL. Phone once.
Links
Live picture · Direction Vision-first · Agent receipt · vision-first-five · Dev Vision-first
Confirmation
Contract c8f3a21b live. Piece 2 present this hour. No invent. No unpark. No hire. Current slot unchanged. No new layer. P empty. Destination delta on P = no material change.